The Federal Executive has introduced that the Ijora-Marine Bridge in Lagos will be closed for 21 days, starting on Also can 18, for pressing repairs.
Mrs. Olukorede Kesha, the Federal Controller of Works in Lagos, acknowledged in a observation on Tuesday that the closure will begin at 7:00 a.m. on Sunday, Also can 18.
Some parts of the bridge will be totally closed, whereas diverse areas might per chance per chance contain partial closures during the repair duration.
The repairs will include lifting the bridge deck to change old bearings and doing diverse crucial maintenance to do the bridge safer and extra comfortable for drivers and pedestrians.
Mrs. Kesha acknowledged she understood that this is able to per chance location off some inconvenience but stressed that it’s a ways a necessity to retain the bridge in blooming condition and do certain all individuals’s safety.
She added that visitors diversions had been arranged, and visitors officers will be on-build aside to information drivers and retain visitors moving easily.
She also asked residents, commuters, and businesses in the build aside to understanding forward and cooperate during the closure.
“Security indicators and visitors administration tools will be location up to minimize disruption,” she acknowledged, whereas apologizing for the inconvenience and thanking all individuals for their persistence.